Follow Peak Growth Partner

Change Order #1: I Stopped Posting to Social Media by Hand

Peak Growth Partner blog

Every contractor knows what a change order is. It's the piece of paper that says: the job isn't what we said it was, here's what's different, and somebody has to sign.

So I filled one out on myself.

Change Order Number One. Original scope: post on social media by hand. New scope: stop doing that.

I'd like it noted that I should have written this one years ago.

Reason for change

The reason, as written on the form: I'm 55, I was posting from a ladder, and my thumbs aren't what they were.

That's not much of a joke. It's what happened. I'd be up there checking a ridge, remember I hadn't posted anything that week, pull out the phone and try to type a caption with gloves on. One thumb. A bad photo. A caption that said "Another one in the books" because I had nothing better.

Then I'd come down and forget which account I'd posted to. Facebook, Instagram, Google Business Profile, YouTube. Four places that all want something slightly different, and they all want it every week.

The real problem underneath

Here's what's actually going on. Homeowners look at your social media to see whether you're real, and whether you know what you're doing. A page that goes quiet for a month looks like a business that went quiet.

But a contractor's job isn't social media. It's the roof. So posting becomes the thing you do when everything else is finished, which means it doesn't get done, or it gets done badly at the end of a long day.

That's a scope problem, not a discipline problem. You were handed a second job and nobody wrote it into the contract.

Added work

The added work on my change order is Media Director.

Here's what it does, and nothing more. Each blog post we publish gets turned into a long video, Shorts and social posts. The posts go out to Facebook, Instagram, YouTube and Google Business Profile. It writes the captions from the blog's own words. It puts everything on a schedule that I set.

Schedule impact: they go out when they're supposed to, whether or not I remembered.

Impact on me: I eat lunch now, sitting down, with both hands.

The signature line

There's a note at the bottom of my form, and it's the most important line on the page. I approve before anything posts.

A change order without a signature isn't a change order. Media Director drafts and schedules, and the owner approves what goes out. It isn't posting behind my back, and it can't post something I haven't seen. If a caption sounds wrong, I fix it or kill it. That's my job, and I'm glad it's the only part of social media that is.

Approved by: Jimmy. Witnessed by: one cold coffee.

What it doesn't do

I'd rather you hear this from me.

Media Director doesn't climb roofs, and it doesn't take the photos. It doesn't know what's on your job today unless you tell it. It makes content from your blog posts, which means somebody has to write an honest blog post first. It also can't promise that anybody sees what it posts. Nobody can promise that, and nobody can promise ChatGPT will name you either.

It takes the repetitive part of social media off your plate. The thinking stays with you.

One thing to do this week, free

You don't need a tool to fix this, only a rule. Pick one sitting a week, and make that the only time you touch social media.

  1. Write down the one question a homeowner asked you this week. "Do I need to replace the whole roof?" works.
  2. Answer it in a few plain sentences. That's your post.
  3. Post it to Facebook and to your Google Business Profile in the same sitting. Both let you schedule.
  4. Close the app. You're done until next week.

One honest answer, posted on a schedule, beats a handful of rushed posts from a ladder. If you want a computer to read your site and tell you what's worth writing about, the free audit at www.peakgrowthpartner.com/audit runs a five-part check in a few seconds. If you have questions about your own scope, you can also read how it works.

Change order accepted.

Want to see how your website reads to ChatGPT? The free audit takes a few seconds.

Run the free audit

Questions

Frequently asked questions

How do I stop posting to social media by hand?

Batch it into one sitting a week and schedule the posts. Or use a tool that makes posts from your blog and schedules them, as long as you approve what goes out.

What does Media Director do?

It turns each blog post into a long video, Shorts and social posts for Facebook, Instagram, YouTube and Google Business Profile, and puts them on a schedule. The owner approves what goes out.

Can social media posts go out without me approving them?

Not with Media Director. The owner approves every post before it goes out.

What should a contractor post about?

Real questions homeowners ask you, answered honestly. One plain answer is worth more than a vague "another one in the books."

Ready to see what AI search sees when it looks at your site?

Book a strategy call. We'll run the audit before we even talk.

Book a strategy call